The result of the work is several documents, which include a balanced work
schedule, with due account to the delivery and installation time of technological
equipment, a balanced schedule of the need for materials, people, machines and
mechanisms.
On-site construction support, ensuring, in the event of deviations during the Project
implementation, the adoption of effective operational organizational, and technological
solutions, allows you to keep the Project within the target indicators specified by the
Customer.
Implementation of the concept allows for ensuring reduction of non-production
losses, which can be achieved due to:
– increasing the accuracy of calculating physical volumes (using verified/validated
BIM models) of work.
– transition from empirical top-down planning to accurate bottom-up modeling;
– justified by calculations of the choice of the best (with minimal costs) way of
implementing the project among the available opportunities and limitations (time,
cost, resource, logistics and climatic);
– modeling to work processes and, as a result, the transition from standards for
large-scale types of work to technologically sound standards;
– ensuring balance, taking into account the interchangeability and qualifications of
resources, enabling to reduce rush jobs and equipment downtime;
– making optimal, accurate, grounded and coordinated organizational and technological
decisions during the entire project;
– operational control from the "field" with minimal human involvement.